Permit: TC-RES-1026-05792
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
30 E 1ST ST
Address NEW:
30 E 1ST ST
Apply Date:
10/19/2026
Applicant:
Sue Wilson
Description:
interior hot & cold repipe of the domestic water distribution system, and install a 40 gallon gas water heater, like for like
Permit Reviews
Permit Number - TC-RES-1026-05792
Permit Status: Complete
Permit Description: interior hot & cold repipe of the domestic water distribution system, and install a 40 gallon gas water heater, like for like
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/19/2026 | RESIDENTIAL SIMPLE REVIEW v.1 | 10/19/2026 | REQUIRES RESUBMIT |
| 10/27/2026 | RESIDENTIAL SIMPLE REVIEW v.2 | 10/27/2026 | APPROVED |
Conditions
Permit Number - TC-RES-1026-05792
Permit Status: Complete
Permit Description: interior hot & cold repipe of the domestic water distribution system, and install a 40 gallon gas water heater, like for like
| Date | Description | Comments |
|---|---|---|
| 10/27/2026 | Pre-Issuance - Required Documents - Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-1026-05792
Permit Description: interior hot & cold repipe of the domestic water distribution system, and install a 40 gallon gas water heater, like for like
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/06/2026 | RSPL - Plumbing Progress | Passed | ||
| 11/06/2026 | COT - RSPL - Plumbing Final | Passed | 11-6-26 Plumbing final approved |