Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address:
330 S PORTER AV
Address NEW:
330 S PORTER AV
Apply Date:
10/08/2026
Applicant:
Emmanuel Ledezma
Description:
Replace existing meter base and 125 amp main breaker load center for new 200 amp meter base and 200 amp main breaker load center and install surge protector

Permit Reviews

Permit Number - TC-RES-1026-05580
Permit Status: Complete
Permit Description: Replace existing meter base and 125 amp main breaker load center for new 200 amp meter base and 200 amp main breaker load center and install surge protector
Start Date Submittal Complete Date Status  
10/08/2026 RESIDENTIAL SIMPLE REVIEW v.1 10/08/2026 APPROVED Review Details
10/08/2026 ADMINISTRATIVE v.1 10/08/2026 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-RES-1026-05580
Permit Status: Complete
Permit Description: Replace existing meter base and 125 amp main breaker load center for new 200 amp meter base and 200 amp main breaker load center and install surge protector
Date Description Comments
10/08/2026 Pre-Issuance - Required Documents - Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-1026-05580
Permit Description: Replace existing meter base and 125 amp main breaker load center for new 200 amp meter base and 200 amp main breaker load center and install surge protector
Total Completed Inspections - 3
Date Description Inspector Results Comments
10/21/2026 BULD - Electrical Clearance Passed 10-21-26 INCR clearance approved called in at 11:48 AM
10/21/2026 RSEL - Electrical Progress Passed
10/28/2026 COT - RSEL - Electrical Final Passed

Documents

File Name Document Type  
330 S PORTER AVE SITE PLAN_V1.PDF DOCUMENTS VIEW
SURGE PROTECTOR-H1_V1.PDF DOCUMENTS VIEW