Permit: TC-RES-1026-05499
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
6835 S SANTA CLARA AV
Address NEW:
6835 S SANTA CLARA AV
Apply Date:
10/01/2026
Applicant:
Inty Ops
Description:
INSTALLATION OF A TESLA POWERWALL 3 BATTERY STORAGE
Permit Reviews
Permit Number - TC-RES-1026-05499
Permit Status: Complete
Permit Description: INSTALLATION OF A TESLA POWERWALL 3 BATTERY STORAGE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/02/2026 | RESIDENTIAL SIMPLE REVIEW v.1 | 10/02/2026 | REQUIRES RESUBMIT |
| 10/05/2026 | RESIDENTIAL SIMPLE REVIEW v.2 | 10/06/2026 | APPROVED |
Conditions
Permit Number - TC-RES-1026-05499
Permit Status: Complete
Permit Description: INSTALLATION OF A TESLA POWERWALL 3 BATTERY STORAGE
| Date | Description | Comments |
|---|---|---|
| 10/06/2026 | Pre-Issuance - Required Documents - Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-1026-05499
Permit Description: INSTALLATION OF A TESLA POWERWALL 3 BATTERY STORAGE
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/05/2026 | COT - RSEL - Grounding/Bonding | Passed | ||
| 11/05/2026 | BULD - Electrical Clearance | Passed | 11-5-26 DGL/BAT clearance approved verbal clearance given to TEP on site at 9:32 AM called in at 10:02 AM | |
| 11/05/2026 | COT - RSEL - Electrical Final | Passed | 11-5-26 electrical final approved | |
| 11/05/2026 | RSBU - Building Final | Passed | 11-5-26 building final approved | |
| 11/05/2026 | RSEL - Electrical Progress | Passed |