Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Residential Building - One or Two Family
Address NEW:
6844 E SPEEDWAY BL
Apply Date:
10/15/2025
Applicant:
Samuel Rojas
Description:
Upgrade main service panel with new 200A rated main panel with main breaker.

Permit Reviews

Permit Number - TC-RES-1025-05040
Permit Status: Inspections
Permit Description: Upgrade main service panel with new 200A rated main panel with main breaker.
Start Date Submittal Complete Date Status  
10/15/2025 RESIDENTIAL SIMPLE REVIEW v.1 10/16/2025 APPROVED Review Details

Conditions

Permit Number - TC-RES-1025-05040
Permit Status: Inspections
Permit Description: Upgrade main service panel with new 200A rated main panel with main breaker.
Date Description Comments
10/15/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-RES-1025-05040
Permit Description: Upgrade main service panel with new 200A rated main panel with main breaker.
Total Completed Inspections - 3
Date Description Inspector Results Comments
11/13/2025 BULD - Electrical Clearance Passed 11.13.25
System is installed per code
Conductors are sized correctly and landed.
Neutral marked with white tape
System is grounded and bonded.
APPROVED for INCR clearance to TEP
11/13/2025 RSEL - Electrical Progress Passed
11/13/2025 COT - RSEL - Electrical Final Passed 11.13.25
System is installed per code
Conductors are sized correctly and landed.
Neutral marked with white tape
System is grounded and bonded.
APPROVED for INCR clearance to TEP

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
6844 E SPEEDWAY_V1.PDF DOCUMENTS VIEW