Permit: TC-RES-1025-04974
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2704 E ELM ST
Address NEW:
2704 E ELM ST
Apply Date:
10/10/2025
Applicant:
Inty Ops
Description:
Installation of a 15.20 kW (AC) PV Solar System
Permit Reviews
Permit Number - TC-RES-1025-04974
Permit Status: Complete
Permit Description: Installation of a 15.20 kW (AC) PV Solar System
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/10/2025 | RESIDENTIAL SOLAR v.1 | 11/06/2025 | APPROVED |
Conditions
Permit Number - TC-RES-1025-04974
Permit Status: Complete
Permit Description: Installation of a 15.20 kW (AC) PV Solar System
| Date | Description | Comments |
|---|---|---|
| 10/10/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-1025-04974
Permite Description: Installation of a 15.20 kW (AC) PV Solar System
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/19/2025 | BULD - Electrical Clearance | N/A | Partial Pass | Partial pass. Verbal clearance to TEP DGL. (MSA). 12/19/2025 |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-1025-04974
Permit Description: Installation of a 15.20 kW (AC) PV Solar System
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/08/2026 | RSBU - Building Final | Passed | 1.8.26 Approved PV system installed per plans |
|
| 01/08/2026 | COT - RSOL - Electrical Final Solar Project | Passed | 1.8.26 Approved PV system installed per plans |
|
| 01/08/2026 | BULD - Electrical Clearance | Passed | 1.8.26 APPROVED FOR DGC CLEARANCE TO TEP. |