Permit: TC-RES-1025-04884
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
3773 E SENECA ST
Address NEW:
3773 E SENECA ST
Apply Date:
10/06/2025
Applicant:
Christopher Roop
Description:
200A Panel Upgrade
Permit Reviews
Permit Number - TC-RES-1025-04884
Permit Status: Complete
Permit Description: 200A Panel Upgrade
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/23/2025 | ADMINISTRATIVE v.1 | 10/23/2025 | REQUIRES RESUBMIT |
| 10/24/2025 | ADMINISTRATIVE v.2 | 10/24/2025 | APPROVED |
| 10/07/2025 | RESIDENTIAL ADD/ALT v.1 | 10/23/2025 | APPROVED |
Conditions
Permit Number - TC-RES-1025-04884
Permit Status: Complete
Permit Description: 200A Panel Upgrade
| Date | Description | Comments |
|---|---|---|
| 10/23/2025 | The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account. | |
| 10/07/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-1025-04884
Permite Description: 200A Panel Upgrade
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/25/2025 | BULD - Electrical Clearance | N/A | Not Ready | Not ready Power kill is scheduled for the 2nd of December. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-1025-04884
Permit Description: 200A Panel Upgrade
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/04/2025 | BULD - Electrical Clearance | Passed | 12.04.2025 Clearance to TEP INCR for 200A MPU cutover. |
|
| 12/04/2025 | RSBU - Building Final | Passed | 12.04.2025 Approved per plan, all circuits landed and labeled. |