Permit: TC-RES-1025-04883
Permit Details
Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
6566 E VIA ARROYO LARGO
Address NEW:
6566 E VIA ARROYO LARGO
Apply Date:
10/06/2025
Applicant:
Brittney Neely
Description:
Installation of a 5.915 kW rooftop mounted photovoltaic system with battery storage system.
Permit Reviews
Permit Number - TC-RES-1025-04883
Permit Status: Inspections
Permit Description: Installation of a 5.915 kW rooftop mounted photovoltaic system
with battery storage system.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/06/2025 | RESIDENTIAL SOLAR v.1 | 11/07/2025 | APPROVED |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-RES-1025-04883
Permite Description: Installation of a 5.915 kW rooftop mounted photovoltaic system
with battery storage system.
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/15/2025 | RSBU - Building Final | N/A | Canceled | 12/15/2025 Canceled per contractor. Verified in-field everything is per approved plan, MSA has not been set and waiting TEP powerkill to set at later date. |
| 12/15/2025 | COT - RSOL - Electrical Final Solar Project | N/A | Canceled | 12/15/2025 Canceled per contractor. Verified in-field everything is per approved plan, MSA has not been set and waiting TEP powerkill to set at later date. |
| 12/15/2025 | BULD - Electrical Clearance | N/A | Canceled | 12/15/2025 Canceled per contractor. Verified in field everything is per approved plan, MSA has not been set and waiting TEP powerkill to set at later date. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-RES-1025-04883
Permit Description: Installation of a 5.915 kW rooftop mounted photovoltaic system
with battery storage system.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/27/2026 | RSBU - Building Final | Passed | 01/27/2026 Clearance TEP DGC/DGL/BAT at 10:35am. |
|
| 01/27/2026 | COT - RSOL - Electrical Final Solar Project | Passed | ||
| 01/27/2026 | BULD - Electrical Clearance | Passed | 01/27/2026 Clearance TEP DGC/DGL/BAT at 10:35am. |