Permit Details

Status:
Inspections
Type:
Residential Building - One or Two Family
Apply Date:
10/06/2025
Applicant:
Brittney Neely
Description:
Installation of a 5.915 kW rooftop mounted photovoltaic system with battery storage system.

Permit Reviews

Permit Number - TC-RES-1025-04883
Permit Status: Inspections
Permit Description: Installation of a 5.915 kW rooftop mounted photovoltaic system with battery storage system.
Start Date Submittal Complete Date Status  
10/06/2025 RESIDENTIAL SOLAR v.1 11/07/2025 APPROVED Review Details

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-RES-1025-04883
Permite Description: Installation of a 5.915 kW rooftop mounted photovoltaic system with battery storage system.
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
12/15/2025 RSBU - Building Final N/A Canceled 12/15/2025
Canceled per contractor. Verified in-field everything is per approved plan, MSA has not been set and waiting TEP powerkill to set at later date.
12/15/2025 COT - RSOL - Electrical Final Solar Project N/A Canceled 12/15/2025
Canceled per contractor. Verified in-field everything is per approved plan, MSA has not been set and waiting TEP powerkill to set at later date.
12/15/2025 BULD - Electrical Clearance N/A Canceled 12/15/2025
Canceled per contractor. Verified in field everything is per approved plan, MSA has not been set and waiting TEP powerkill to set at later date.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-RES-1025-04883
Permit Description: Installation of a 5.915 kW rooftop mounted photovoltaic system with battery storage system.
Total Completed Inspections - 3
Date Description Inspector Results Comments
01/27/2026 RSBU - Building Final Passed 01/27/2026
Clearance TEP DGC/DGL/BAT at 10:35am.
01/27/2026 COT - RSOL - Electrical Final Solar Project Passed
01/27/2026 BULD - Electrical Clearance Passed 01/27/2026
Clearance TEP DGC/DGL/BAT at 10:35am.