Permit: TC-RES-1024-06291
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
4826 E CANARY GRASS DR
Address NEW:
4826 E CANARY GRASS DR
Apply Date:
10/29/2024
Applicant:
Arnou Aghamalian
Description:
Installation of a 8.40 kW Roof-Mounted Solar PV System consisting of (21) Modules, and (21) Micro-Inverters.
Permit Reviews
Permit Number - TC-RES-1024-06291
Permit Status: Complete
Permit Description: Installation of a 8.40 kW Roof-Mounted Solar PV System consisting of (21) Modules, and (21) Micro-Inverters.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/30/2024 | RESIDENTIAL SOLAR v.1 | 11/29/2024 | APPROVED |
Conditions
Permit Number - TC-RES-1024-06291
Permit Status: Complete
Permit Description: Installation of a 8.40 kW Roof-Mounted Solar PV System consisting of (21) Modules, and (21) Micro-Inverters.
| Date | Description | Comments |
|---|---|---|
| 12/02/2024 | The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account. | |
| 12/02/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-1024-06291
Permit Description: Installation of a 8.40 kW Roof-Mounted Solar PV System consisting of (21) Modules, and (21) Micro-Inverters.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/08/2025 | RSBU - Building Final | Passed | 1/8/25 pass | |
| 01/08/2025 | COT - RSOL - Electrical Final Solar Project | Passed | 1/8/25 pass | |
| 01/08/2025 | BULD - Electrical Clearance | Passed | 1/8/25 approval for TEP DGC |