Description:
Installation of Roof mounted 10.40kW with Battery & 225A MPU REV1: • Adding utility isolation disco switch • MPU busbar rating from 225A to 400A • Adding backup load panel • New Tesla Backup gateway - 3
Permit Reviews
Permit Number - TC-RES-1024-06218
Permit Status: Complete
Permit Description: Installation of Roof mounted 10.40kW with Battery & 225A MPU
REV1: • Adding utility isolation disco switch
• MPU busbar rating from 225A to 400A
• Adding backup load panel
• New Tesla Backup gateway - 3
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/28/2024 | RESIDENTIAL SOLAR v.1 | 11/26/2024 | APPROVED |
| 01/08/2025 | RESIDENTIAL SOLAR REVISION v.1 | 02/06/2025 | APPROVED |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-1024-06218
Permit Description: Installation of Roof mounted 10.40kW with Battery & 225A MPU
REV1: • Adding utility isolation disco switch
• MPU busbar rating from 225A to 400A
• Adding backup load panel
• New Tesla Backup gateway - 3
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/13/2025 | BULD - Electrical Clearance | Passed | Passed solar final 10/13/25 CLEARANCE DGC/BAT | |
| 10/13/2025 | RSBU - Building Final | Passed | Passed solar final 10/13/25 CLEARANCE DGC/BAT | |
| 10/13/2025 | COT - RSOL - Electrical Final Solar Project | Passed | Passed solar final 10/13/25 CLEARANCE DGC/BAT | |
| 10/13/2025 | COT - RSOL - Grounding/Bonding Solar Project | Passed | Passed solar final 10/13/25 CLEARANCE DGC/BAT |