Permit: TC-RES-1024-06215
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
7319 E ELI DR
Address NEW:
7319 E ELI DR
Apply Date:
10/25/2024
Applicant:
TFS Solar
Description:
Roof mount 2.10kW DC ADDITION to existing photovoltaic solar system (new total system size: 14.65 kW), 5 additional DC modules with rapid shutdown, 1 ADDITIONAL Tesla Powerwall+ inverter and battery with 1 string, connected to Existing PV subpanel.
Permit Reviews
Permit Number - TC-RES-1024-06215
Permit Status: Complete
Permit Description: Roof mount 2.10kW DC ADDITION to existing photovoltaic solar system (new total system size: 14.65 kW), 5 additional DC modules with rapid shutdown, 1 ADDITIONAL Tesla Powerwall+ inverter and battery with 1 string, connected to Existing PV subpanel.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/28/2024 | RESIDENTIAL SOLAR v.1 | 11/06/2024 | REQUIRES RESUBMIT |
| 12/12/2024 | RESIDENTIAL SOLAR v.2 | 12/30/2024 | APPROVED |
Conditions
Permit Number - TC-RES-1024-06215
Permit Status: Complete
Permit Description: Roof mount 2.10kW DC ADDITION to existing photovoltaic solar system (new total system size: 14.65 kW), 5 additional DC modules with rapid shutdown, 1 ADDITIONAL Tesla Powerwall+ inverter and battery with 1 string, connected to Existing PV subpanel.
| Date | Description | Comments |
|---|---|---|
| 12/30/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-1024-06215
Permit Description: Roof mount 2.10kW DC ADDITION to existing photovoltaic solar system (new total system size: 14.65 kW), 5 additional DC modules with rapid shutdown, 1 ADDITIONAL Tesla Powerwall+ inverter and battery with 1 string, connected to Existing PV subpanel.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/30/2025 | BULD - Electrical Clearance | Passed | Approved with 175A derate, Tesla collar and battery - DGC/BAT Clearance to TEP is required | |
| 01/30/2025 | RSBU - Building Final | Passed | ||
| 01/30/2025 | COT - RSOL - Electrical Final Solar Project | Passed |