Permit: TC-RES-1024-06022
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
130 N SIERRA VISTA DR
Address NEW:
130 N SIERRA VISTA DR
Apply Date:
10/16/2024
Applicant:
TFS Solar
Description:
Roof mount 9.46kW DC photovoltaic solar system; 22 modules; 14 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 2 strings; 225A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch
Permit Reviews
Permit Number - TC-RES-1024-06022
Permit Status: Complete
Permit Description: Roof mount 9.46kW DC photovoltaic solar system; 22 modules; 14 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 2 strings; 225A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/16/2024 | RESIDENTIAL SOLAR v.1 | 11/15/2024 | APPROVED |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-1024-06022
Permit Description: Roof mount 9.46kW DC photovoltaic solar system; 22 modules; 14 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 2 strings; 225A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/30/2025 | COT - RSOL - Grounding/Bonding Solar Project | Passed | Installation per plans, grounding and bonding present. CLEARANCE DGL/DGC/BAT | |
| 01/30/2025 | RSBU - Building Final | Passed | Installation per plans, grounding and bonding present. CLEARANCE DGL/DGC/BAT | |
| 01/30/2025 | COT - RSOL - Electrical Final Solar Project | Passed | Installation per plans, grounding and bonding present. CLEARANCE DGL/DGC/BAT | |
| 01/30/2025 | BULD - Electrical Clearance | Passed | Installation per plans, grounding and bonding present. CLEARANCE DGL/DGC/BAT |