Permit: TC-RES-1024-05854
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
375 N LONGFELLOW AV
Address NEW:
375 N LONGFELLOW AV
Apply Date:
10/10/2024
Applicant:
TFS Solar
Description:
Roof mount 6.88 kW DC photovoltaic solar system; 16 modules; 27 kWh Storage, 2 Tesla Powerwall-3 batteries with integrated PV inverter with 1 string each; 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch
Permit Reviews
Permit Number - TC-RES-1024-05854
Permit Status: Complete
Permit Description: Roof mount 6.88 kW DC photovoltaic solar system; 16 modules; 27 kWh Storage, 2 Tesla Powerwall-3 batteries with integrated PV inverter with 1 string each; 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/10/2024 | RESIDENTIAL SOLAR v.1 | 11/08/2024 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-1024-05854
Permite Description: Roof mount 6.88 kW DC photovoltaic solar system; 16 modules; 27 kWh Storage, 2 Tesla Powerwall-3 batteries with integrated PV inverter with 1 string each; 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/05/2024 | BULD - Electrical Clearance | N/A | Partial Pass | Upgrade per code, gave verbal to TEP 9:51am called Marcia 9:52 am CLEARANCE DGL PARTIAL PASS PENDING SOLAR |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-1024-05854
Permit Description: Roof mount 6.88 kW DC photovoltaic solar system; 16 modules; 27 kWh Storage, 2 Tesla Powerwall-3 batteries with integrated PV inverter with 1 string each; 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/11/2024 | RSBU - Building Final | Passed | ||
| 12/11/2024 | COT - RSOL - Electrical Final Solar Project | Passed | ||
| 12/11/2024 | BULD - Electrical Clearance | Passed | Approved solar and Powerwall 3 - DGC/BAT Clearance to TEP is required for the solar meter |