Permit: TC-RES-1024-05818
Permit Details
Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
3653 N VINE AV
Address NEW:
3653 N VINE AV
Apply Date:
10/08/2024
Applicant:
TFS Solar
Description:
Roof mount 12.04 kW DC photovoltaic solar system; 28 modules; 14 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 2 strings; 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch
Permit Reviews
Permit Number - TC-RES-1024-05818
Permit Status: Inspections
Permit Description: Roof mount 12.04 kW DC photovoltaic solar system; 28 modules; 14 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 2 strings; 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/09/2024 | RESIDENTIAL SOLAR v.1 | 11/06/2024 | APPROVED |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-RES-1024-05818
Permite Description: Roof mount 12.04 kW DC photovoltaic solar system; 28 modules; 14 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 2 strings; 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/16/2024 | COT - RSOL - Electrical Final Solar Project | N/A | Canceled |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-RES-1024-05818
Permit Description: Roof mount 12.04 kW DC photovoltaic solar system; 28 modules; 14 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 2 strings; 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/16/2024 | COT - RSOL - Grounding/Bonding Solar Project | Passed | Approved grounding and underground conduit from main service panel to the auxiliary equipment location, okay to backfill progress areas | |
| 12/17/2024 | BULD - Electrical Clearance | Passed | Approved solar and Powerwall 3 - DGC/BAT Clearance to TEP is required | |
| 12/17/2024 | RSBU - Building Final | Passed |