Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-RES-1024-05788
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
945 N 5TH AV
Address NEW:
945 N 5TH AV
Apply Date:
10/07/2024
Applicant:
Doni Nicoll-Duir
Description:
Install 8.2 kW DC solar electric system on roofs of existing garage and existing accessory structure.
Permit Reviews
Permit Number - TC-RES-1024-05788
Permit Status: Complete
Permit Description: Install 8.2 kW DC solar electric system on roofs of existing garage and existing accessory structure.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/05/2024 | RESIDENTIAL SOLAR v.2 | 12/05/2024 | REQUIRES RESUBMIT |
| 01/13/2025 | RESTAMP - RESIDENTIAL v.1 | 01/13/2025 | APPROVED |
| 10/08/2024 | RESIDENTIAL SOLAR v.1 | 11/05/2024 | REQUIRES RESUBMIT |
| 12/10/2024 | RESIDENTIAL SOLAR v.3 | 01/13/2025 | APPROVED |
Conditions
Permit Number - TC-RES-1024-05788
Permit Status: Complete
Permit Description: Install 8.2 kW DC solar electric system on roofs of existing garage and existing accessory structure.
| Date | Description | Comments |
|---|---|---|
| 01/13/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-1024-05788
Permit Description: Install 8.2 kW DC solar electric system on roofs of existing garage and existing accessory structure.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/18/2025 | RSBU - Building Final | Passed | ||
| 03/18/2025 | COT - RSOL - Electrical Final Solar Project | Passed | ||
| 03/18/2025 | COT - RSOL - Grounding/Bonding Solar Project | Passed | ||
| 03/18/2025 | BULD - Electrical Clearance | Passed | Approved solar - DGC Clearance to TEP is required for the solar meter |