Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address NEW:
2949 N PLACITA NUEVA
Apply Date:
10/03/2024
Applicant:
TFS Solar
Description:
Roof mount 6.97 kW DC photovoltaic solar system; 17 AC modules, 2 branches, PV Combiner Box, 40A PV breaker on 225A bus with 200 A MCB; service upgrade for both meter and load center

Permit Reviews

Permit Number - TC-RES-1024-05735
Permit Status: Complete
Permit Description: Roof mount 6.97 kW DC photovoltaic solar system; 17 AC modules, 2 branches, PV Combiner Box, 40A PV breaker on 225A bus with 200 A MCB; service upgrade for both meter and load center
Start Date Submittal Complete Date Status  
10/03/2024 RESIDENTIAL SOLAR v.1 10/31/2024 APPROVED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-RES-1024-05735
Permite Description: Roof mount 6.97 kW DC photovoltaic solar system; 17 AC modules, 2 branches, PV Combiner Box, 40A PV breaker on 225A bus with 200 A MCB; service upgrade for both meter and load center
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
11/18/2024 BULD - Electrical Clearance N/A Partial Pass Installed her code, grounding and bonding present. CLEARANCE INCR called Marcia 1:23 to restore power, left voicemail. Partial pass pending solar

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-1024-05735
Permit Description: Roof mount 6.97 kW DC photovoltaic solar system; 17 AC modules, 2 branches, PV Combiner Box, 40A PV breaker on 225A bus with 200 A MCB; service upgrade for both meter and load center
Total Completed Inspections - 4
Date Description Inspector Results Comments
11/21/2024 RSBU - Building Final Passed
11/21/2024 COT - RSOL - Electrical Final Solar Project Passed Installed per plans, grounding, bonding, and labels per code. CLEARANCE DGC 11/21/24
11/21/2024 COT - RSOL - Grounding/Bonding Solar Project Passed Installed per plans, grounding, bonding, and labels per code. CLEARANCE DGC 11/21/24
11/21/2024 BULD - Electrical Clearance Passed Installed per plans, grounding, bonding, and labels per code. CLEARANCE DGC 11/21/24

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-KRAMER URSULA PV 6.97KW-DRAWINGS_V1.PDF DOCUMENTS VIEW
KRAMER URSULA PV 6.97KW-SPECS_V1.PDF DOCUMENTS VIEW