Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-RES-1024-05684
Permit Details
Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
9727 E GRAY HAWK DR
Address NEW:
9727 E GRAY HAWK DR
Apply Date:
10/01/2024
Applicant:
Natalia Soto
Description:
10.400 kW rooftop PV solar system installation
Permit Reviews
Permit Number - TC-RES-1024-05684
Permit Status: Inspections
Permit Description: 10.400 kW rooftop PV solar system installation
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/01/2024 | RESIDENTIAL SOLAR v.1 | 10/29/2024 | APPROVED |
Conditions
Permit Number - TC-RES-1024-05684
Permit Status: Inspections
Permit Description: 10.400 kW rooftop PV solar system installation
| Date | Description | Comments |
|---|---|---|
| 10/18/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 10/18/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-RES-1024-05684
Permite Description: 10.400 kW rooftop PV solar system installation
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/26/2024 | RSBU - Building Final | N/A | Partial Pass | 11/26/25 Partial pass, waiting on the sewer receipt documents. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-RES-1024-05684
Permit Description: 10.400 kW rooftop PV solar system installation
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/26/2024 | COT - RSOL - Electrical Final Solar Project | Passed | 11/26/24 system installed per specifications and schedule. pass. TEP code GDC/GDL | |
| 12/05/2024 | RSBU - Building Final | Passed | 12/5/24 PASS |