Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

The login landing page when selecting 'View' is still occurring and is still pending further investigation. 

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address NEW:
5074 E FORT LOWELL RD
Apply Date:
10/31/2023
Applicant:
Danny Foster
Description:
* Emergency gas line* The bid price is to include replacing the gas line from the existing meter to the stove, running a new line on the front of the building and connecting to the existing lateral line on top of the roof. The customer is responsible for any drywall stucco, patching, painting, or any other work not listed above. If the customer needs additional work that is not listed above, another price will be given before proceeding.

Permit Reviews

Permit Number - TC-RES-1023-09164
Permit Status: Complete
Permit Description: * Emergency gas line* The bid price is to include replacing the gas line from the existing meter to the stove, running a new line on the front of the building and connecting to the existing lateral line on top of the roof. The customer is responsible for any drywall stucco, patching, painting, or any other work not listed above. If the customer needs additional work that is not listed above, another price will be given before proceeding.
Start Date Submittal Complete Date Status  
10/31/2023 RESIDENTIAL SIMPLE REVIEW v.1 10/31/2023 APPROVED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-1023-09164
Permit Description: * Emergency gas line* The bid price is to include replacing the gas line from the existing meter to the stove, running a new line on the front of the building and connecting to the existing lateral line on top of the roof. The customer is responsible for any drywall stucco, patching, painting, or any other work not listed above. If the customer needs additional work that is not listed above, another price will be given before proceeding.
Total Completed Inspections - 2
Date Description Inspector Results Comments
11/01/2023 COT - RSPL - Plumbing Final Passed Called SWG for clearance at 9:18am
11/01/2023 COT - BULD - SWG Clearance Passed Called SWG for clearance at 9:18am

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
DRAWING FOR SUE GILES_V1.PDF DOCUMENTS VIEW
SPAPP-PERMIT FOR PERMISSION FOR CITY OF TUCSON FOR SUE GILES -2023-10-31_V1.PDF DOCUMENTS VIEW