Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-RES-1023-08992
Permit Details
Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Address:
2415 N BROKEN ARROW TR
Apply Date:
10/23/2023
Applicant:
TFS Solar
Description:
Roof mounted 9.43 kW DC photovoltaic solar system; 23 modules, 1 Tesla Powerwall+ inverter with 2 strings, 1 additional Tesla Powerwall-2, 27 kWh storage; 80A PV breaker, existing main service; 200A bus with 200A MCB, interconnection via PCS
Permit Reviews
Permit Number - TC-RES-1023-08992
Permit Status: Inspections complete
Permit Description: Roof mounted 9.43 kW DC photovoltaic solar system; 23 modules, 1 Tesla Powerwall+ inverter with 2 strings, 1 additional Tesla Powerwall-2, 27 kWh storage; 80A PV breaker, existing main service; 200A bus with 200A MCB, interconnection via PCS
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
10/23/2023 | RESIDENTIAL SOLAR v.1 | 11/22/2023 | APPROVED |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-1023-08992
Permite Description: Roof mounted 9.43 kW DC photovoltaic solar system; 23 modules, 1 Tesla Powerwall+ inverter with 2 strings, 1 additional Tesla Powerwall-2, 27 kWh storage; 80A PV breaker, existing main service; 200A bus with 200A MCB, interconnection via PCS
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/09/2024 | BULD - Electrical Clearance | N/A | Partial Pass | Partial pass. Verbal clearance to TEP DGL. Pending solar install. 1/9/2024 |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-1023-08992
Permit Description: Roof mounted 9.43 kW DC photovoltaic solar system; 23 modules, 1 Tesla Powerwall+ inverter with 2 strings, 1 additional Tesla Powerwall-2, 27 kWh storage; 80A PV breaker, existing main service; 200A bus with 200A MCB, interconnection via PCS
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/29/2024 | BULD - Electrical Clearance | Passed | Approved, DGC/BAT Clearance to TEP is required for the solar meter and battery storage | |
01/29/2024 | RSBU - Building Final | Passed | ||
01/29/2024 | COT - RSOL - Electrical Final Solar Project | Passed |