Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address:
5362 S 6TH AV
Apply Date:
10/17/2023
Applicant:
Andres Amado
Description:
Installation of new Private water service line from the Meter to 10' outside of the house (house Connection) part of Rodeo addition phase 2 TW project. The water line will be a 1-inch pex, buried at 14 inches. 12awg tracer wire will be taped to the pex every ten ft. from the new meter to the tie-in point. The new 5/8 meter will have a 1-inch meter valve installed on the customer's side.

Permit Reviews

Permit Number - TC-RES-1023-08871
Permit Status: Complete
Permit Description: Installation of new Private water service line from the Meter to 10' outside of the house (house Connection) part of Rodeo addition phase 2 TW project. The water line will be a 1-inch pex, buried at 14 inches. 12awg tracer wire will be taped to the pex every ten ft. from the new meter to the tie-in point. The new 5/8 meter will have a 1-inch meter valve installed on the customer's side.
Start Date Submittal Complete Date Status  
10/17/2023 RESIDENTIAL SIMPLE REVIEW v.1 10/17/2023 APPROVED Review Details

Conditions

Permit Number - TC-RES-1023-08871
Permit Status: Complete
Permit Description: Installation of new Private water service line from the Meter to 10' outside of the house (house Connection) part of Rodeo addition phase 2 TW project. The water line will be a 1-inch pex, buried at 14 inches. 12awg tracer wire will be taped to the pex every ten ft. from the new meter to the tie-in point. The new 5/8 meter will have a 1-inch meter valve installed on the customer's side.
Date Description Comments
10/17/2023 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as a contact. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-1023-08871
Permit Description: Installation of new Private water service line from the Meter to 10' outside of the house (house Connection) part of Rodeo addition phase 2 TW project. The water line will be a 1-inch pex, buried at 14 inches. 12awg tracer wire will be taped to the pex every ten ft. from the new meter to the tie-in point. The new 5/8 meter will have a 1-inch meter valve installed on the customer's side.
Total Completed Inspections - 3
Date Description Inspector Results Comments
07/10/2024 COT - RSPL - Yard Water Line Passed Project complete.
07/10/2024 RSPL - Plumbing Progress Passed
07/10/2024 COT - RSPL - Plumbing Final Passed Project complete.
CLOSE PERMIT

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
5362 S 6TH AVE_V1.PDF DOCUMENTS VIEW