Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-RES-1023-08853
Permit Details
Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Address:
30 N CAMINO MIRAMONTE
Apply Date:
10/17/2023
Applicant:
TFS Solar
Description:
roof mount 2.6 kW DC addition to existing photovoltaic solar system (new total system size: 9.95 kW), 6 additional modules, 1 branch circuit, PV subpanel, 60A PV breaker on 200A bus with 175A MCB, [main breaker derate from existing 200A]
Permit Reviews
Permit Number - TC-RES-1023-08853
Permit Status: Inspections complete
Permit Description: roof mount 2.6 kW DC addition to existing photovoltaic solar system (new total system size: 9.95 kW), 6 additional modules, 1 branch circuit, PV subpanel, 60A PV breaker on 200A bus with 175A MCB, [main breaker derate from existing 200A]
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
10/17/2023 | RESIDENTIAL SOLAR v.1 | 10/31/2023 | APPROVED |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-1023-08853
Permit Description: roof mount 2.6 kW DC addition to existing photovoltaic solar system (new total system size: 9.95 kW), 6 additional modules, 1 branch circuit, PV subpanel, 60A PV breaker on 200A bus with 175A MCB, [main breaker derate from existing 200A]
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/14/2024 | RSBU - Building Final | Passed | ||
02/14/2024 | COT - RSOL - Electrical Final Solar Project | Passed | ||
02/14/2024 | BULD - Electrical Clearance | Passed | Approved, DGC Clearance to TEP is required for the solar meter |