Permit: TC-RES-1023-08729
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
5451 S MISSIONDALE RD
Address NEW:
5451 S MISSIONDALE RD
Apply Date:
10/12/2023
Applicant:
Andres Amado
Description:
Installation of new Private water service line from the Meter to 10' outside of the house (house Connection) part of Rodeo addition phase 2 TW project. The water line will be a 1-inch pex, buried at 14 inches. 12awg tracer wire will be taped to the pex every ten ft. from the new meter to the tie-in point. The new 5/8 meter will have a 1-inch meter valve installed on the customer's side.
Permit Reviews
Permit Number - TC-RES-1023-08729
Permit Status: Complete
Permit Description: Installation of new Private water service line from the Meter to 10' outside of the house (house Connection) part of Rodeo addition phase 2 TW project. The water line will be a 1-inch pex, buried at 14 inches. 12awg tracer wire will be taped to the pex every ten ft. from the new meter to the tie-in point. The new 5/8 meter will have a 1-inch meter valve installed on the customer's side.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/12/2023 | RESIDENTIAL SIMPLE REVIEW v.1 | 10/12/2023 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-1023-08729
Permite Description: Installation of new Private water service line from the Meter to 10' outside of the house (house Connection) part of Rodeo addition phase 2 TW project. The water line will be a 1-inch pex, buried at 14 inches. 12awg tracer wire will be taped to the pex every ten ft. from the new meter to the tie-in point. The new 5/8 meter will have a 1-inch meter valve installed on the customer's side.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/02/2024 | RSPL - Plumbing Progress | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-1023-08729
Permit Description: Installation of new Private water service line from the Meter to 10' outside of the house (house Connection) part of Rodeo addition phase 2 TW project. The water line will be a 1-inch pex, buried at 14 inches. 12awg tracer wire will be taped to the pex every ten ft. from the new meter to the tie-in point. The new 5/8 meter will have a 1-inch meter valve installed on the customer's side.
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/02/2024 | COT - RSPL - Plumbing Final | Passed | Approved 1"PEX yard water line from the new meter location to the tie-in at the house, okay to shade fill progress areas | |
| 08/02/2024 | COT - RSPL - Yard Water Line | Passed |