Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address:
7443 E 34TH ST
Address NEW:
7443 E 34TH ST
Apply Date:
10/03/2023
Applicant:
Bailey Randall
Description:
Roof Mounted PV System DC SYSTEM SIZE (kW): 10 kW / AC SYSTEM SIZE (kW): 7.25 kW With main service panel upgrade 25 modules

Permit Reviews

Permit Number - TC-RES-1023-08499
Permit Status: Complete
Permit Description: Roof Mounted PV System DC SYSTEM SIZE (kW): 10 kW / AC SYSTEM SIZE (kW): 7.25 kW With main service panel upgrade 25 modules
Start Date Submittal Complete Date Status  
11/15/2023 RESIDENTIAL SOLAR v.1 11/24/2023 APPROVED Review Details
06/28/2024 RESIDENTIAL SOLAR v.1 06/28/2024 REQUIRES RESUBMIT Review Details
07/01/2024 RESIDENTIAL SOLAR v.2 07/02/2024 APPROVED Review Details
10/03/2023 RESIDENTIAL SOLAR v.1 10/25/2023 APPROVED Review Details
05/03/2024 RESIDENTIAL SOLAR v.1 05/17/2024 APPROVED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-RES-1023-08499
Permite Description: Roof Mounted PV System DC SYSTEM SIZE (kW): 10 kW / AC SYSTEM SIZE (kW): 7.25 kW With main service panel upgrade 25 modules
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
08/21/2024 RSBU - Building Final N/A Canceled NR canceled by contractor
08/21/2024 COT - RSOL - Grounding/Bonding Solar Project N/A Canceled
08/21/2024 COT - RSOL - Electrical Final Solar Project N/A Canceled NR canceled by contractor

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-1023-08499
Permit Description: Roof Mounted PV System DC SYSTEM SIZE (kW): 10 kW / AC SYSTEM SIZE (kW): 7.25 kW With main service panel upgrade 25 modules
Total Completed Inspections - 4
Date Description Inspector Results Comments
09/05/2024 RSBU - Building Final Passed
09/05/2024 COT - RSOL - Grounding/Bonding Solar Project Passed
09/05/2024 COT - RSOL - Electrical Final Solar Project Passed
09/05/2024 BULD - Electrical Clearance Passed Approved -DGC Clearance to TEP is required for the solar meter

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-MANUEL ROMERO PLANS_V2.PDF DOCUMENTS VIEW
MANUEL ROMERO REV NARRATIVE_V2.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-223141_ELECTRICAL_ENGINEERING (1)_V1.PDF DOCUMENTS VIEW
MANUEL ROMERO REV NARRATIVE_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-201385_STRUCTURAL_ENGINEERING_V1.PDF DOCUMENTS VIEW
RESPONSE LETTER TC-RES-1023-08499_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
194428_STRUCTURAL_ENGINEERING_V1.PDF DOCUMENTS VIEW
CONS-194429_STRUCTURAL_ENGINEERING_V1.PDF DOCUMENTS VIEW
VSUN-400-108M-BB (6) COP COPY 15_V1.PDF DOCUMENTS VIEW