Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Apply Date:
03/03/2022
Applicant:
Ramon VALDEZ
Description:
DUPLEX DUPLVAL82 T22-M0037

Permit Reviews

Permit Number - TC-RES-1022-00107
Permit Status: Complete
Permit Description: DUPLEX DUPLVAL82 T22-M0037
Start Date Submittal Complete Date Status  
12/07/2022 RESIDENTIAL NEW DWELLING v.1 12/12/2022 APPROVED Review Details
12/12/2022 RESIDENTIAL NEW DWELLING v.1 12/12/2022 APPROVED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-1022-00107
Permit Description: DUPLEX DUPLVAL82 T22-M0037
Total Completed Inspections - 18
Date Description Inspector Results Comments
12/15/2022 COT - RSPL - Rough Soil Passed okay to backfill.
12/15/2022 COT - RSPL - Sewer Passed okay to backfill.
12/19/2022 COT - RSBU - Preslab Passed okay for concrete.
12/19/2022 COT - RSBU - Excavation/Rebar/Zoning Passed okay for concrete in footings.
12/19/2022 COT - RSEL - Grounding/Bonding Passed UFER is in place.
12/30/2022 COT - RSPL - Yard Water Line Passed
01/23/2023 RSBU - Building Progress Passed firewall/fire barrier between units is 5/8” type X drywall properly nailed off floor to bottom of roof deck. Joints are being taped and mudded.
01/23/2023 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed H2.5 clips are installed and properly nailed to the top plate and trusses.
01/23/2023 COT - RSBU - Roof Nailing Passed roof nailing is good. okay to dry-in roof.
01/26/2023 BULD - Electrical Clearance Passed clearance for TEP ECO. Botha unit 1 and 2.
01/26/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
01/26/2023 COT - RSEL - Temporary Service Passed clearance for TEP ECO. Both unit 1 and 2.
03/01/2023 COT - RSEL - Electrical Final Passed Inspection is for Units #1 & #2.
03/01/2023 COT - RSEL - Outdoor Lighting Passed Inspection is for Units #1 & #2.
03/01/2023 RSBU - Building Final Passed Inspection is for Units #1 & #2.
03/01/2023 COT - RSME - Mechanical Final Passed Inspection is for Units #1 & #2
03/01/2023 COT - RSPL - Plumbing Final Passed Inspection is for units #1 and #2
03/01/2023 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-CONS-YAVAPAI SITE PLAN _V1_V1.PDF DOCUMENTS VIEW
YAVAPAI APPLICATION _V1_V1.PDF DOCUMENTS VIEW