Permit: TC-RES-0926-05261
Permit Details
Status:
In Review
Type:
Residential Building - One or Two Family
Address:
5242 E ALHAMBRA PL
Address NEW:
5242 E ALHAMBRA PL
Apply Date:
09/21/2026
Applicant:
TFS Solar
Description:
13.5 kWh Storage, 1 Tesla Powerwall-3 battery only added to existing solar. Service upgrade to 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup.
Permit Reviews
Permit Number - TC-RES-0926-05261
Permit Status: In review
Permit Description: 13.5 kWh Storage, 1 Tesla Powerwall-3 battery only added to existing solar. Service upgrade to 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/21/2026 | RESIDENTIAL SOLAR v.1 | 09/30/2026 | APPROVED |
Conditions
Permit Number - TC-RES-0926-05261
Permit Status: In review
Permit Description: 13.5 kWh Storage, 1 Tesla Powerwall-3 battery only added to existing solar. Service upgrade to 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup.
| Date | Description | Comments |
|---|---|---|
| 09/30/2026 | Pre-Issuance - Required Documents - Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Outstanding Inspections
Permit Status: In Review
Permit Number: TC-RES-0926-05261
Permite Description: 13.5 kWh Storage, 1 Tesla Powerwall-3 battery only added to existing solar. Service upgrade to 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup.
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| BULD - Electrical Clearance | N/A | Scheduled | ||
| COT - RSOL - Electrical Final Solar Project | N/A | Requested | ||
| RSBU - Building Final | N/A | Requested |
Scheduled Inspections
Scheduled Inspections - TC-RES-0926-05261
Status: In Review
Description: 13.5 kWh Storage, 1 Tesla Powerwall-3 battery only added to existing solar. Service upgrade to 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup.
| Scheduled Date | Description | Entered By | Entered Date |
|---|---|---|---|
| 11/09/2026 | BULD - Electrical Clearance | Scheduled | |
| 11/02/2026 | BULD - Electrical Clearance | Scheduled |
For information about today’s scheduled inspections please refer to the
PDSD Daily Inspections Dashboards (Desktop)
PDSD Daily Inspections Dashboards (Mobile)
.