Permit: TC-RES-0926-05248
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2407 E 20TH ST
Address NEW:
2407 E 20TH ST
Apply Date:
09/21/2026
Applicant:
Daniel Smith
Description:
Repipe of hot and cold water lines from main riser to all water fixtures in the home. Wfsu - 16 90ft of 1/2 PEX and 120 ft 3/4 PEX. Total: 210 ft of PEX.
Permit Reviews
Permit Number - TC-RES-0926-05248
Permit Status: Complete
Permit Description: Repipe of hot and cold water lines from main riser to all water fixtures in the home. Wfsu - 16
90ft of 1/2 PEX and 120 ft 3/4 PEX. Total: 210 ft of PEX.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/21/2026 | RESIDENTIAL SIMPLE REVIEW v.1 | 09/21/2026 | APPROVED |
Conditions
Permit Number - TC-RES-0926-05248
Permit Status: Complete
Permit Description: Repipe of hot and cold water lines from main riser to all water fixtures in the home. Wfsu - 16
90ft of 1/2 PEX and 120 ft 3/4 PEX. Total: 210 ft of PEX.
| Date | Description | Comments |
|---|---|---|
| 09/21/2026 | Pre-Issuance - Required Documents - Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0926-05248
Permit Description: Repipe of hot and cold water lines from main riser to all water fixtures in the home. Wfsu - 16
90ft of 1/2 PEX and 120 ft 3/4 PEX. Total: 210 ft of PEX.
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/25/2026 | RSPL - Plumbing Progress | Passed | ||
| 09/25/2026 | COT - RSPL - Plumbing Final | Passed | 09/25/2026 Holding under test at riser PRV at 60psi, verified bracing and fire caulked top plate penetrations throughout. |