Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address NEW:
958 N ROSEMONT BL
Apply Date:
09/15/2026
Applicant:
Inty Ops
Description:
REV_1, Disconnect Relocation INSTALLATION OF A TESLA POWERWALL 3 11.5 KW AND BATTERY INTEGRATED, STORAGE DEVICE 13.5KWH

Permit Reviews

Permit Number - TC-RES-0926-05146
Permit Status: Complete
Permit Description: REV_1, Disconnect Relocation INSTALLATION OF A TESLA POWERWALL 3 11.5 KW AND BATTERY INTEGRATED, STORAGE DEVICE 13.5KWH
Start Date Submittal Complete Date Status  
09/15/2026 RESIDENTIAL SIMPLE REVIEW v.1 09/16/2026 APPROVED Review Details
10/09/2026 RESIDENTIAL SIMPLE REVIEW REVISION v.1 10/09/2026 APPROVED Review Details

Conditions

Permit Number - TC-RES-0926-05146
Permit Status: Complete
Permit Description: REV_1, Disconnect Relocation INSTALLATION OF A TESLA POWERWALL 3 11.5 KW AND BATTERY INTEGRATED, STORAGE DEVICE 13.5KWH
Date Description Comments
09/16/2026 Pre-Issuance - Required Documents - Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-RES-0926-05146
Permite Description: REV_1, Disconnect Relocation INSTALLATION OF A TESLA POWERWALL 3 11.5 KW AND BATTERY INTEGRATED, STORAGE DEVICE 13.5KWH
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
11/04/2026 COT - BULD - SWG Clearance N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0926-05146
Permit Description: REV_1, Disconnect Relocation INSTALLATION OF A TESLA POWERWALL 3 11.5 KW AND BATTERY INTEGRATED, STORAGE DEVICE 13.5KWH
Total Completed Inspections - 4
Date Description Inspector Results Comments
11/04/2026 BULD - Electrical Clearance Passed 11-4-26 DGL/BAT clearance approved. Verbal clearance given to TEP on site at 11:56 called in at 11:57 AM
11/04/2026 COT - RSEL - Grounding/Bonding Passed
11/04/2026 COT - LCBU - Building Final Passed 11-4-26 building final approved
11/04/2026 COT - LCEL - Electrical Final Passed 11-4-26 electrical final approved

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
CONS-PATRICK TESKE_V4_10-09-2026-958-ROSEMONT-BL_V1.PDF DOCUMENTS VIEW
PATRICK TESKE_RESPONSE LETTER-2026-10-09_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
PATRICK TESKE_V3_09-11-2026_V1.PDF DOCUMENTS VIEW