Permit: TC-RES-0926-05140
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
3320 N BABY BRUNO WY
Address NEW:
3320 N BABY BRUNO WY
Apply Date:
09/15/2026
Applicant:
Project Manager
Description:
Installation/replacement of meter socket/utility metering equipment and associated electrical connections for PV + ESS system, including 200A Tesla Backup Switch, per plans.
Permit Reviews
Permit Number - TC-RES-0926-05140
Permit Status: Complete
Permit Description: Installation/replacement of meter socket/utility metering equipment and associated electrical connections for PV + ESS system, including 200A Tesla Backup Switch, per plans.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/15/2026 | RESIDENTIAL SIMPLE REVIEW v.1 | 09/16/2026 | REQUIRES RESUBMIT |
| 09/22/2026 | RESIDENTIAL SIMPLE REVIEW v.2 | 09/22/2026 | APPROVED |
Conditions
Permit Number - TC-RES-0926-05140
Permit Status: Complete
Permit Description: Installation/replacement of meter socket/utility metering equipment and associated electrical connections for PV + ESS system, including 200A Tesla Backup Switch, per plans.
| Date | Description | Comments |
|---|---|---|
| 09/22/2026 | Pre-Issuance - Required Documents - Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0926-05140
Permite Description: Installation/replacement of meter socket/utility metering equipment and associated electrical connections for PV + ESS system, including 200A Tesla Backup Switch, per plans.
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/01/2026 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 10/01/2026 | COT - RSEL - Electrical Underground | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0926-05140
Permit Description: Installation/replacement of meter socket/utility metering equipment and associated electrical connections for PV + ESS system, including 200A Tesla Backup Switch, per plans.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/01/2026 | BULD - Electrical Clearance | Passed | Verbal clearance to TEP DGL. (Tesla backup switch) 10/1/2026 | |
| 10/01/2026 | COT - RSEL - Electrical Final | Passed | ||
| 10/01/2026 | COT - RSEL - Grounding/Bonding | Passed | ||
| 10/01/2026 | RSEL - Electrical Progress | Passed |