Permit: TC-RES-0926-05047
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
1634 E SENECA ST
Address NEW:
1634 E SENECA ST
Apply Date:
09/10/2026
Applicant:
Description:
* Replacement of gas piping to furnace, water heater and stove **
Permit Reviews
Permit Number - TC-RES-0926-05047
Permit Status: Complete
Permit Description: * Replacement of gas piping to furnace, water heater and stove **
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/10/2026 | RESIDENTIAL SIMPLE REVIEW v.1 | 09/10/2026 | APPROVED |
Conditions
Permit Number - TC-RES-0926-05047
Permit Status: Complete
Permit Description: * Replacement of gas piping to furnace, water heater and stove **
| Date | Description | Comments |
|---|---|---|
| 09/10/2026 | Pre-Issuance - Required Documents - Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0926-05047
Permite Description: * Replacement of gas piping to furnace, water heater and stove **
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/16/2026 | COT - BULD - SWG Clearance | N/A | Not Ready | |
| 09/16/2026 | COT - RSPL - Plumbing Final | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0926-05047
Permit Description: * Replacement of gas piping to furnace, water heater and stove **
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/17/2026 | COT - BULD - SWG Clearance | Passed | 09/17/2026 Approved clearance for Southwest Gas. |
|
| 09/17/2026 | COT - RSPL - Plumbing Final | Passed | 09/17/2026 Approved plan. Verified BI line holding under test and secured with unistrut clamps and blocks on roof, shutoff valves. |