Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address:
230 N 2ND AV
Address NEW:
230 N 2ND AV
Apply Date:
09/09/2026
Applicant:
TFS Solar
Description:
Roof mount 3.92kW DC photovoltaic solar system; 9 modules with microinverters, 1 branches, 20A PV breaker on 125A bus with 100A MCB. Interconnection Via 120% rule.

Permit Reviews

Permit Number - TC-RES-0926-05020
Permit Status: Complete
Permit Description: Roof mount 3.92kW DC photovoltaic solar system; 9 modules with microinverters, 1 branches, 20A PV breaker on 125A bus with 100A MCB. Interconnection Via 120% rule.
Start Date Submittal Complete Date Status  
09/10/2026 RESIDENTIAL SOLAR v.1 09/21/2026 APPROVED Review Details

Conditions

Permit Number - TC-RES-0926-05020
Permit Status: Complete
Permit Description: Roof mount 3.92kW DC photovoltaic solar system; 9 modules with microinverters, 1 branches, 20A PV breaker on 125A bus with 100A MCB. Interconnection Via 120% rule.
Date Description Comments
09/21/2026 Pre-Issuance - Required Documents - Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0926-05020
Permit Description: Roof mount 3.92kW DC photovoltaic solar system; 9 modules with microinverters, 1 branches, 20A PV breaker on 125A bus with 100A MCB. Interconnection Via 120% rule.
Total Completed Inspections - 3
Date Description Inspector Results Comments
10/12/2026 BULD - Electrical Clearance Passed 10-12-26 DGC approved
10/12/2026 COT - RSOL - Electrical Final Solar Project Passed 10-12-26 Electrical final approved
10/12/2026 RSBU - Building Final Passed 10-12-26 building final approved

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
CONS-MOSIER ANDREW PV - DRAWINGS-230-2ND-AV_V1.PDF DOCUMENTS VIEW
MOSIER ANDREW PV - SPECS_V1.PDF DOCUMENTS VIEW