Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Inspections
Type:
Residential Building - One or Two Family
Address NEW:
6755 E ESCALANTE RD
Apply Date:
09/30/2025
Applicant:
JOSE LOPEZ
Description:
Upgrade existing 100amp service to 200amps in existing location

Permit Reviews

Permit Number - TC-RES-0925-04809
Permit Status: Inspections
Permit Description: Upgrade existing 100amp service to 200amps in existing location
Start Date Submittal Complete Date Status  
10/01/2025 RESIDENTIAL SIMPLE REVIEW v.1 10/02/2025 APPROVED Review Details

Conditions

Permit Number - TC-RES-0925-04809
Permit Status: Inspections
Permit Description: Upgrade existing 100amp service to 200amps in existing location
Date Description Comments
10/01/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-RES-0925-04809
Permit Description: Upgrade existing 100amp service to 200amps in existing location
Total Completed Inspections - 2
Date Description Inspector Results Comments
11/05/2025 COT - RSEL - Electrical Final Passed 11.5.25
APPROVED
Installed per plans, grounded, bonded, appropriate supports, appropriate labels, connections and conductors verified.
11/05/2025 BULD - Electrical Clearance Passed 11.5.25
APPROVED FOR INCR CLEARANCE TO TEP