Permit: TC-RES-0925-04806
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
9276 E WILD WASH DR
Address NEW:
9276 E WILD WASH DR
Apply Date:
09/30/2025
Applicant:
Brittney Neely
Description:
Installation of a 13.195 kW rooftop mounted photovoltaic system with battery storage system and 200A MPU.
Permit Reviews
Permit Number - TC-RES-0925-04806
Permit Status: Complete
Permit Description: Installation of a 13.195 kW rooftop mounted photovoltaic system
with battery storage system and 200A MPU.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/01/2025 | RESIDENTIAL SOLAR v.1 | 10/31/2025 | APPROVED |
Conditions
Permit Number - TC-RES-0925-04806
Permit Status: Complete
Permit Description: Installation of a 13.195 kW rooftop mounted photovoltaic system
with battery storage system and 200A MPU.
| Date | Description | Comments |
|---|---|---|
| 10/23/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0925-04806
Permite Description: Installation of a 13.195 kW rooftop mounted photovoltaic system
with battery storage system and 200A MPU.
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/26/2025 | BULD - Electrical Clearance | N/A | Partial Pass | 12/26/25: TEP INCR VERBAL CLEARANCE AT 1:15pm. Pending solar |
| 12/26/2025 | RSBU - Building Final | N/A | Not Ready | 12/26/25: TEP INCR VERBAL CLEARANCE AT 1:15pm. Pending solar |
| 12/26/2025 | COT - RSOL - Electrical Final Solar Project | N/A | Not Ready | 12/26/25: TEP INCR VERBAL CLEARANCE AT 1:15pm. Pending solar |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0925-04806
Permit Description: Installation of a 13.195 kW rooftop mounted photovoltaic system
with battery storage system and 200A MPU.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/21/2026 | BULD - Electrical Clearance | Passed | 1/21/26 PASSED SOLAR FINAL DGC/BAT/DGL | |
| 01/21/2026 | RSBU - Building Final | Passed | 1/21/26 PASSED SOLAR FINAL DGC/BAT/DGL | |
| 01/21/2026 | COT - RSOL - Electrical Final Solar Project | Passed | 1/21/26 PASSED SOLAR FINAL DGC/BAT/DGL |