Permit: TC-RES-0925-04776
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2174 W PAINTED SUNSET CI
Address NEW:
2174 W PAINTED SUNSET CI
Apply Date:
09/29/2025
Applicant:
Inty Ops
Description:
REV_2, STANDALONE ESS ONLY; Rev_1 Electrical Plans updated; Installation of a 3.49 kW (AC) PV System + Battery Storage + Main Breaker De-Rate to 175A
Permit Reviews
Permit Number - TC-RES-0925-04776
Permit Status: Complete
Permit Description: REV_2, STANDALONE ESS ONLY; Rev_1 Electrical Plans updated; Installation of a 3.49 kW (AC) PV System + Battery Storage + Main Breaker De-Rate to 175A
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/06/2026 | RESIDENTIAL SOLAR REVISION v.1 | 03/09/2026 | APPROVED |
| 09/29/2025 | RESIDENTIAL SOLAR v.1 | 10/31/2025 | APPROVED |
| 11/07/2025 | RESIDENTIAL SOLAR REVISION v.1 | 11/26/2025 | APPROVED |
Conditions
Permit Number - TC-RES-0925-04776
Permit Status: Complete
Permit Description: REV_2, STANDALONE ESS ONLY; Rev_1 Electrical Plans updated; Installation of a 3.49 kW (AC) PV System + Battery Storage + Main Breaker De-Rate to 175A
| Date | Description | Comments |
|---|---|---|
| 10/23/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0925-04776
Permite Description: REV_2, STANDALONE ESS ONLY; Rev_1 Electrical Plans updated; Installation of a 3.49 kW (AC) PV System + Battery Storage + Main Breaker De-Rate to 175A
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/29/2025 | BULD - Electrical Clearance | N/A | Not Ready | Not ready. MSA not per approved plans. Revise set of plans for the install in the field. 12/29/2025 |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0925-04776
Permit Description: REV_2, STANDALONE ESS ONLY; Rev_1 Electrical Plans updated; Installation of a 3.49 kW (AC) PV System + Battery Storage + Main Breaker De-Rate to 175A
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/01/2026 | BULD - Electrical Clearance | Passed | 4/1/26 TEP CLEARANCE: BAT |
|
| 04/01/2026 | COT - RSOL - Electrical Final Solar Project | Passed |