Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Residential Building - One or Two Family
Address NEW:
1922 S TIMBERLINE AV
Apply Date:
09/24/2025
Applicant:
Inty Ops
Description:
Installation of a 11.50 kW (AC) Tesla Powerwall 3 Inverter + Battery Integrated

Permit Reviews

Permit Number - TC-RES-0925-04712
Permit Status: Inspections
Permit Description: Installation of a 11.50 kW (AC) Tesla Powerwall 3 Inverter + Battery Integrated
Start Date Submittal Complete Date Status  
09/25/2025 RESIDENTIAL SOLAR v.1 10/24/2025 APPROVED Review Details

Conditions

Permit Number - TC-RES-0925-04712
Permit Status: Inspections
Permit Description: Installation of a 11.50 kW (AC) Tesla Powerwall 3 Inverter + Battery Integrated
Date Description Comments
10/15/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-RES-0925-04712
Permit Description: Installation of a 11.50 kW (AC) Tesla Powerwall 3 Inverter + Battery Integrated
Total Completed Inspections - 1
Date Description Inspector Results Comments
11/19/2025 BULD - Electrical Clearance Passed Partial pass pending solar CLEARANCE DGL

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-JAMES GARDNER PLANS V01_V1.PDF DOCUMENTS VIEW
EQUIPMENT SPECIFICATIONS_V1.PDF DOCUMENTS VIEW