Permit: TC-RES-0925-04690
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
4364 E 3RD ST
Address NEW:
4364 E 3RD ST
Apply Date:
09/24/2025
Applicant:
TFS Solar
Description:
Roof mount 3.87kW DC photovoltaic solar system; 9 AC modules. Single branch to PV combiner box, interconnection via 60A meter socket adapter. 200A bus with 200A MCB.
Permit Reviews
Permit Number - TC-RES-0925-04690
Permit Status: Complete
Permit Description: Roof mount 3.87kW DC photovoltaic solar system; 9 AC modules. Single branch to PV combiner box, interconnection via 60A meter socket adapter. 200A bus with 200A MCB.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/24/2025 | RESIDENTIAL SOLAR v.1 | 10/24/2025 | APPROVED |
Conditions
Permit Number - TC-RES-0925-04690
Permit Status: Complete
Permit Description: Roof mount 3.87kW DC photovoltaic solar system; 9 AC modules. Single branch to PV combiner box, interconnection via 60A meter socket adapter. 200A bus with 200A MCB.
| Date | Description | Comments |
|---|---|---|
| 10/13/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0925-04690
Permite Description: Roof mount 3.87kW DC photovoltaic solar system; 9 AC modules. Single branch to PV combiner box, interconnection via 60A meter socket adapter. 200A bus with 200A MCB.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/02/2025 | BULD - Electrical Clearance | N/A | Partial Pass | TEP CLEARANCE: DGL, called TEP @ 9:23. Pending solar. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0925-04690
Permit Description: Roof mount 3.87kW DC photovoltaic solar system; 9 AC modules. Single branch to PV combiner box, interconnection via 60A meter socket adapter. 200A bus with 200A MCB.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/06/2026 | BULD - Electrical Clearance | Passed | 1.6.26 Approved for DGC PV system is installed per plans |
|
| 01/06/2026 | RSBU - Building Final | Passed | 1.6.26 Approved PV system is installed per plans |
|
| 01/06/2026 | COT - RSOL - Electrical Final Solar Project | Passed | 1.6.26 Approved PV system is installed per plans |