Permit: TC-RES-0925-04652
Permit Details
Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Address:
4814 E GREENWAY WASH DR
Address NEW:
4814 E GREENWAY WASH DR
Apply Date:
09/22/2025
Applicant:
Dana Petty
Description:
Convert temporary construction office from Permit T22CM07731 back to garage
Permit Reviews
Permit Number - TC-RES-0925-04652
Permit Status: Inspections complete
Permit Description: Convert temporary construction office from Permit T22CM07731 back to garage
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/24/2025 | RESIDENTIAL ADD/ALT v.1 | 09/25/2025 | REQUIRES RESUBMIT |
| 09/30/2025 | RESIDENTIAL ADD/ALT v.2 | 10/21/2025 | APPROVED |
Conditions
Permit Number - TC-RES-0925-04652
Permit Status: Inspections complete
Permit Description: Convert temporary construction office from Permit T22CM07731 back to garage
| Date | Description | Comments |
|---|---|---|
| 09/24/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-0925-04652
Permit Description: Convert temporary construction office from Permit T22CM07731 back to garage
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/18/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 2.18.26 Approved |
|
| 02/18/2026 | RSBU - Building Final | Passed | 2.18.26 Approved |
|
| 02/18/2026 | COT - RSEL - Electrical Final | Passed | 2.18.26 Approved |
|
| 02/18/2026 | COT - RSME - Mechanical Final | Passed | 2.18.26 Approved |