Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address NEW:
880 N CARRIBEAN AV
Apply Date:
09/16/2025
Applicant:
TFS Solar
Description:
Roof mount 7.83 kW DC photovoltaic solar system; 18 modules; 13.5 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 3 strings. 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup.

Permit Reviews

Permit Number - TC-RES-0925-04570
Permit Status: Complete
Permit Description: Roof mount 7.83 kW DC photovoltaic solar system; 18 modules; 13.5 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 3 strings. 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup.
Start Date Submittal Complete Date Status  
09/17/2025 RESIDENTIAL SOLAR v.1 10/29/2025 APPROVED Review Details

Conditions

Permit Number - TC-RES-0925-04570
Permit Status: Complete
Permit Description: Roof mount 7.83 kW DC photovoltaic solar system; 18 modules; 13.5 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 3 strings. 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup.
Date Description Comments
10/08/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-RES-0925-04570
Permite Description: Roof mount 7.83 kW DC photovoltaic solar system; 18 modules; 13.5 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 3 strings. 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
12/01/2025 BULD - Electrical Clearance N/A Partial Pass 12.01.2025
Verbal clearance to TEP DGL for MSA at 10:15am. Partial pending solar final.

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0925-04570
Permit Description: Roof mount 7.83 kW DC photovoltaic solar system; 18 modules; 13.5 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 3 strings. 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup.
Total Completed Inspections - 3
Date Description Inspector Results Comments
01/28/2026 BULD - Electrical Clearance Passed 01/28/2026
Clearance TEP DGC/BAT.
01/28/2026 RSBU - Building Final Passed
01/28/2026 COT - RSOL - Electrical Final Solar Project Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-RUDKIN TERENCE PV 7.83 KW STORAGE 13.5 KWH-DRAWINGS_V1.PDF DOCUMENTS VIEW
RUDKIN TERENCE PV 7.83 KW STORAGE 13.5 KWH-SPECS_V1.PDF DOCUMENTS VIEW