Permit: TC-RES-0925-04523
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
10260 E CORTE MADERA FINA
Address NEW:
10260 E CORTE MADERA FINA
Apply Date:
09/12/2025
Applicant:
Brittney Neely
Description:
Installation of a 10.010 kW rooftop mounted photovoltaic system with 175A derate.
Permit Reviews
Permit Number - TC-RES-0925-04523
Permit Status: Complete
Permit Description: Installation of a 10.010 kW rooftop mounted photovoltaic system with 175A derate.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/30/2025 | RESIDENTIAL SOLAR v.2 | 10/30/2025 | APPROVED |
| 09/12/2025 | RESIDENTIAL SOLAR v.1 | 09/12/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-RES-0925-04523
Permit Status: Complete
Permit Description: Installation of a 10.010 kW rooftop mounted photovoltaic system with 175A derate.
| Date | Description | Comments |
|---|---|---|
| 10/20/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0925-04523
Permite Description: Installation of a 10.010 kW rooftop mounted photovoltaic system with 175A derate.
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/30/2025 | COT - RSOL - Electrical Final Solar Project | N/A | Canceled | unable to contact contractor |
| 12/30/2025 | BULD - Electrical Clearance | N/A | Canceled | unable to contact contractor |
| 12/30/2025 | RSBU - Building Final | N/A | Canceled | unable to contact contractor |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0925-04523
Permit Description: Installation of a 10.010 kW rooftop mounted photovoltaic system with 175A derate.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/12/2026 | COT - RSOL - Electrical Final Solar Project | Passed | Passed solar final 1/12/26 Clearance DGC | |
| 01/12/2026 | BULD - Electrical Clearance | Passed | Passed solar final 1/12/26 Clearance DGC | |
| 01/12/2026 | RSBU - Building Final | Passed | Passed solar final 1/12/26 Clearance DGC |