Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2904 E 8TH ST
Address NEW:
2904 E 8TH ST
Apply Date:
09/11/2025
Applicant:
TFS Solar
Description:
REV_1, Electrical Equipment Relocation; Roof mount 6.5 kW DC addition to existing photovoltaic solar system (new total system size: 13.72 kW), 15 additional AC modules (2 branches), PV combiner + PV subpanel. Feeder tap interconnection to 200A load center with 200A MCB. 60A fuses for PV interconnection to 200A MCB. 400A MCB with 2x200A MCB.

Permit Reviews

Permit Number - TC-RES-0925-04499
Permit Status: Complete
Permit Description: REV_1, Electrical Equipment Relocation; Roof mount 6.5 kW DC addition to existing photovoltaic solar system (new total system size: 13.72 kW), 15 additional AC modules (2 branches), PV combiner + PV subpanel. Feeder tap interconnection to 200A load center with 200A MCB. 60A fuses for PV interconnection to 200A MCB. 400A MCB with 2x200A MCB.
Start Date Submittal Complete Date Status  
09/11/2025 RESIDENTIAL SOLAR v.1 10/22/2025 APPROVED Review Details
11/28/2025 RESIDENTIAL SOLAR REVISION v.1 12/11/2025 APPROVED Review Details
11/21/2025 ADMINISTRATIVE v.2 11/21/2025 APPROVED Review Details
10/22/2025 ADMINISTRATIVE v.1 10/22/2025 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-RES-0925-04499
Permit Status: Complete
Permit Description: REV_1, Electrical Equipment Relocation; Roof mount 6.5 kW DC addition to existing photovoltaic solar system (new total system size: 13.72 kW), 15 additional AC modules (2 branches), PV combiner + PV subpanel. Feeder tap interconnection to 200A load center with 200A MCB. 60A fuses for PV interconnection to 200A MCB. 400A MCB with 2x200A MCB.
Date Description Comments
10/16/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
10/16/2025 Permit is awaiting TC-RES-0825-03859, once Trade permit is in "Inspections Complete" Status this permit will be ready for issuance

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0925-04499
Permit Description: REV_1, Electrical Equipment Relocation; Roof mount 6.5 kW DC addition to existing photovoltaic solar system (new total system size: 13.72 kW), 15 additional AC modules (2 branches), PV combiner + PV subpanel. Feeder tap interconnection to 200A load center with 200A MCB. 60A fuses for PV interconnection to 200A MCB. 400A MCB with 2x200A MCB.
Total Completed Inspections - 3
Date Description Inspector Results Comments
12/23/2025 BULD - Electrical Clearance Passed Clearance for TEP DGC. 12/23/2025
12/23/2025 RSBU - Building Final Passed
12/23/2025 COT - RSOL - Electrical Final Solar Project Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
BYERLY NATE PERMIT REVISION NARRATIVE_V1.PDF DOCUMENTS VIEW
CONS-BYERLEY NATE PV COMBO 6.45 KW - REV1 DRAWINGS_V1.PDF DOCUMENTS VIEW
BYERLEY NATE PV RFC NARRATIVE - TC-RES-0925-04499_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BYERLEY NATE PV COMBO 6.45 KW-SPECS_V1.PDF DOCUMENTS VIEW
CONS-BYERLEY NATE PV COMBO 6.45 KW-DRAWINGS_V1.PDF DOCUMENTS VIEW