Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-RES-0925-04365
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
3490 N PASEO DE SAN AGUSTIN
Address NEW:
3490 N PASEO DE SAN AGUSTIN
Apply Date:
09/04/2025
Applicant:
chad
Description:
Install 7.74 kW DC rooftop solar electric system.
Permit Reviews
Permit Number - TC-RES-0925-04365
Permit Status: Complete
Permit Description: Install 7.74 kW DC rooftop solar electric system.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/04/2025 | RESIDENTIAL SOLAR v.1 | 09/25/2025 | APPROVED |
Conditions
Permit Number - TC-RES-0925-04365
Permit Status: Complete
Permit Description: Install 7.74 kW DC rooftop solar electric system.
| Date | Description | Comments |
|---|---|---|
| 09/25/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0925-04365
Permit Description: Install 7.74 kW DC rooftop solar electric system.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/07/2025 | BULD - Electrical Clearance | Passed | 11.7.25 APPROVED for DGC clearance code to TEP System is installed per plans |
|
| 11/07/2025 | RSBU - Building Final | Passed | 11.7.25 System is installed according to plans APPROVED |
|
| 11/07/2025 | COT - RSOL - Electrical Final Solar Project | Passed | 11.7.25 System is installed according to plans APPROVED |