Permit: TC-RES-0925-04355
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
1817 S 30TH PL
Address NEW:
1817 S 30TH PL
Apply Date:
09/03/2025
Applicant:
Ramon VALDEZ
Description:
SFR
Permit Reviews
Permit Number - TC-RES-0925-04355
Permit Status: Complete
Permit Description: SFR
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/05/2026 | ADMINISTRATIVE v.2 | 02/05/2026 | APPROVED |
| 12/12/2025 | RESIDENTIAL NEW DWELLING v.4 | 12/19/2025 | REQUIRES RESUBMIT |
| 09/05/2025 | RESIDENTIAL NEW DWELLING v.1 | 10/03/2025 | REQUIRES RESUBMIT |
| 12/31/2025 | RESIDENTIAL NEW DWELLING v.5 | 01/08/2026 | REQUIRES RESUBMIT |
| 01/13/2026 | RESIDENTIAL NEW DWELLING v.6 | 01/26/2026 | APPROVED |
| 12/03/2025 | RESIDENTIAL NEW DWELLING v.3 | 12/03/2025 | REQUIRES RESUBMIT |
| 02/27/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/02/2026 | APPROVED |
| 11/03/2025 | RESIDENTIAL NEW DWELLING v.2 | 11/24/2025 | REQUIRES RESUBMIT |
| 06/03/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/04/2026 | APPROVED |
| 01/26/2026 | ADMINISTRATIVE v.1 | 01/26/2026 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-RES-0925-04355
Permit Status: Complete
Permit Description: SFR
| Date | Description | Comments |
|---|---|---|
| 09/30/2025 | Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections. | |
| 09/05/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 01/26/2026 | Prior to Inspections, please submit a Manual J Calculation Step-by-Step instructions on how to resubmit: https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf | |
| 09/05/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 09/30/2025 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0925-04355
Permite Description: SFR
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/08/2026 | COT - BULD - SWG Clearance | N/A | Not Applicable | 5-8-26: not applicable. |
| 03/16/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Partial Pass | 3/16/2026 Partial pass pending revision or engineer letter stating use of 2x4 studs on exterior and interior walls approved. Plan calls for 2x6 studs in detail D. Okay to proceed at own risk. |
| 03/16/2026 | COT - RSBU - Roof Nailing | N/A | Partial Pass | 3/16/2026 Partial pass pending revision or engineer letter stating use of 2x4 studs on exterior and interior walls approved. Plan calls for 2x6 studs in detail D. Okay to proceed at own risk. |
| 05/08/2026 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | 5-8-26: not applicable. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0925-04355
Permit Description: SFR
Total Completed Inspections - 15
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/23/2026 | COT - RSPL - Rough Soil | Passed | Ok to cover progress areas. | |
| 02/23/2026 | COT - RSPL - Sewer | Passed | 3” line connected to main sewer line. | |
| 02/26/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 2/26/2026 Approved per site plan, setbacks, and foundation reinforcement details. Ok for concrete placement. |
|
| 02/26/2026 | COT - RSBU - Preslab | Passed | 2/26/2026 Approved per site plan, setbacks, and foundation reinforcement details. Ok for concrete placement. |
|
| 03/18/2026 | BULD - Electrical Clearance | Passed | 3.18.26 Approved for ECO code to TEP |
|
| 03/18/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 3.18.26 Approved |
|
| 05/08/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 5-8-26: revision submitted & approved by the city. | |
| 05/08/2026 | COT - RSBU - Roof Nailing | Passed | 5-8-26: revision submitted & approved by the city. | |
| 05/08/2026 | COT - RSEL - Electrical Underground | Passed | 5-8-26: approved. | |
| 05/08/2026 | COT - RSEL - Outdoor Lighting | Passed | 5-8-26: approved. | |
| 05/08/2026 | COT - RSME - Mechanical Final | Passed | 5-8-26: approved. | |
| 05/14/2026 | RSBU - Building Final | Passed | 5/14/2026 Verified water glass at showered is tempered glass. |
|
| 05/14/2026 | COT - RSEL - Electrical Final | Passed | 5/14/2026 Knockout plugged. |
|
| 05/14/2026 | COT - RSPL - Yard Water Line | Passed | 5/14/2026 Verified main water trenched at 20" with 1" PEX line from meter to riser - holding under water test. |
|
| 05/14/2026 | COT - RSPL - Plumbing Final | Passed | 5/14/2026 Verified water hammer arrester and fix of door bell near laundry. |