Permit: TC-RES-0924-05585
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2315 E WAVERLY ST
Address NEW:
2315 E WAVERLY ST
Apply Date:
09/25/2024
Applicant:
TFS Solar
Description:
Roof mount 12.04kW DC photovoltaic solar system, 28 AC modules, 3 branches, PV subpanel, interconnect via load side subpanel feeder tap REV1: PV Subpanel was moved inside to the utility room that is adjacent to PV Meter, Disconnect and MSP. A #4/0-03 AL-SER wire alternative for the 200A feeders was added to the wire tag chart.
Permit Reviews
Permit Number - TC-RES-0924-05585
Permit Status: Complete
Permit Description: Roof mount 12.04kW DC photovoltaic solar system, 28 AC modules, 3 branches, PV subpanel, interconnect via load side subpanel feeder tap
REV1: PV Subpanel was moved inside to the utility room that is adjacent to PV Meter, Disconnect and MSP.
A #4/0-03 AL-SER wire alternative for the 200A feeders was added to the wire tag chart.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/01/2024 | RESIDENTIAL SOLAR v.2 | 10/29/2024 | APPROVED |
| 01/24/2025 | RESIDENTIAL SOLAR REVISION v.1 | 02/11/2025 | APPROVED |
| 09/26/2024 | RESIDENTIAL SOLAR v.1 | 09/26/2024 | REQUIRES RESUBMIT |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0924-05585
Permit Description: Roof mount 12.04kW DC photovoltaic solar system, 28 AC modules, 3 branches, PV subpanel, interconnect via load side subpanel feeder tap
REV1: PV Subpanel was moved inside to the utility room that is adjacent to PV Meter, Disconnect and MSP.
A #4/0-03 AL-SER wire alternative for the 200A feeders was added to the wire tag chart.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/12/2025 | RSBU - Building Final | Passed | ||
| 05/12/2025 | BULD - Electrical Clearance | Passed | Clearance for TEP DGC/DGL. 5/12/2025 | |
| 05/12/2025 | COT - RSOL - Electrical Final Solar Project | Passed |