Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

The login landing page when selecting 'View' is still occurring and is still pending further investigation. 

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address:
6261 E 16TH ST
Address NEW:
6261 E 16TH ST
Apply Date:
09/24/2024
Applicant:
Marytine Ramos
Description:
Installation of Roof mounted 8.40kW PV System with Battery

Permit Reviews

Permit Number - TC-RES-0924-05556
Permit Status: Complete
Permit Description: Installation of Roof mounted 8.40kW PV System with Battery
Start Date Submittal Complete Date Status  
12/31/2024 RESIDENTIAL SOLAR REVISION v.2 01/31/2025 REQUIRES RESUBMIT Review Details
12/02/2024 RESTAMP - RESIDENTIAL v.1 12/02/2024 APPROVED Review Details
12/30/2024 RESIDENTIAL SOLAR REVISION v.1 12/30/2024 REQUIRES RESUBMIT Review Details
09/26/2024 RESIDENTIAL SOLAR v.1 10/28/2024 REQUIRES RESUBMIT Review Details
03/17/2025 RESTAMP - RESIDENTIAL v.1 03/19/2025 APPROVED Review Details
02/28/2025 RESIDENTIAL SOLAR REVISION v.4 03/17/2025 APPROVED Review Details
11/04/2024 RESIDENTIAL SOLAR v.2 12/02/2024 APPROVED Review Details
02/11/2025 RESIDENTIAL SOLAR REVISION v.3 02/27/2025 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-RES-0924-05556
Permit Status: Complete
Permit Description: Installation of Roof mounted 8.40kW PV System with Battery
Date Description Comments
01/09/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-RES-0924-05556
Permite Description: Installation of Roof mounted 8.40kW PV System with Battery
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
01/02/2025 BULD - Electrical Clearance N/A Partial Pass Partial for the Tesla meter adapter - DGL Clearance was called into TEP at 11:00
Pending solar

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0924-05556
Permit Description: Installation of Roof mounted 8.40kW PV System with Battery
Total Completed Inspections - 3
Date Description Inspector Results Comments
03/26/2025 RSBU - Building Final Passed
03/26/2025 COT - RSOL - Electrical Final Solar Project Passed
03/26/2025 BULD - Electrical Clearance Passed Approved solar and powerwall 3 - DGC/BAT Clearance to TEP is required

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-STAMPED PE_OUR29128-ESTRADA_ABCAD 1_V4.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CALCULATION REPORT LUIS ESTRADA_V2.PDF DOCUMENTS VIEW
CONS-CRE STAMPED_OUR29128-ESTRADA_CAD 2_V2.PDF DOCUMENTS VIEW
LUIS ESTRADA FPUP PERMIT_V1.PDF DOCUMENTS VIEW