Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address NEW:
5669 E FORT LOWELL RD
Apply Date:
09/17/2024
Applicant:
TFS Solar
Description:
Roof mount 15.99 kW DC photovoltaic solar system; 39 modules; 41 kWh Storage, 3 Tesla Powerwall-3 batteries with integrated PV inverter with 2 string each on two Powerwall-3s and 1 string on another Powerwall-3; Tesla Gateway; 200A bus load center with 200A MCB

Permit Reviews

Permit Number - TC-RES-0924-05382
Permit Status: Complete
Permit Description: Roof mount 15.99 kW DC photovoltaic solar system; 39 modules; 41 kWh Storage, 3 Tesla Powerwall-3 batteries with integrated PV inverter with 2 string each on two Powerwall-3s and 1 string on another Powerwall-3; Tesla Gateway; 200A bus load center with 200A MCB
Start Date Submittal Complete Date Status  
12/11/2024 RESIDENTIAL SOLAR v.2 01/13/2025 APPROVED Review Details
04/22/2025 RESIDENTIAL SOLAR REVISION v.1 05/28/2025 APPROVED Review Details
03/03/2025 RESIDENTIAL SOLAR REVISION v.1 04/01/2025 APPROVED Review Details
01/13/2025 RESTAMP - RESIDENTIAL v.1 01/13/2025 APPROVED Review Details
09/18/2024 RESIDENTIAL SOLAR v.1 10/17/2024 REQUIRES RESUBMIT Review Details

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0924-05382
Permit Description: Roof mount 15.99 kW DC photovoltaic solar system; 39 modules; 41 kWh Storage, 3 Tesla Powerwall-3 batteries with integrated PV inverter with 2 string each on two Powerwall-3s and 1 string on another Powerwall-3; Tesla Gateway; 200A bus load center with 200A MCB
Total Completed Inspections - 4
Date Description Inspector Results Comments
05/29/2025 RSBU - Building Final Passed Installed per stamped plans 5/29/25 CLEARANCE DGC/BAT
05/29/2025 COT - RSOL - Electrical Progress Solar Project Passed Installed per stamped plans 5/29/25 CLEARANCE DGC/BAT
05/29/2025 COT - RSOL - Grounding/Bonding Solar Project Passed Installed per stamped plans 5/29/25 CLEARANCE DGC/BAT
05/29/2025 BULD - Electrical Clearance Passed Installed per stamped plans 5/29/25 CLEARANCE DGC/BAT

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-REV2 KAYE LAURENCE PV 15.99 KW STORAGE 40 KWH EV-DRAWINGS_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-REV1 KAYE LAURENCE PV 15.99 KW STORAGE 40 KWH EV-DRAWINGS_V1.PDF DOCUMENTS VIEW
KAYE LAURENCE PV STORAGE PERMIT REVISION NARRATIVE_V1.PDF DOCUMENTS VIEW
REV1 KAYE LAURENCE PV 15.99 KW STORAGE 40 KWH EV-SPECS_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-KAYE LAURENCE PV 15.99 KW STORAGE 40.5 KWH EV-DRAWINGS_V2.PDF DOCUMENTS VIEW
KAYE LAURENCE PV 15.99 KW STORAGE 40.5 KWH EV-SPECS_V2.PDF DOCUMENTS VIEW