Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Address:
1019 E SILVER ST
Address NEW:
1019 E SILVER ST
Apply Date:
09/16/2024
Applicant:
alex enoch
Description:
SFR

Permit Reviews

Permit Number - TC-RES-0924-05356
Permit Status: Issued
Permit Description: SFR
Start Date Submittal Complete Date Status  
04/28/2025 RESIDENTIAL NEW DWELLING REVISION v.1 04/28/2025 REQUIRES RESUBMIT Review Details
10/23/2024 RESIDENTIAL NEW DWELLING v.3 11/13/2024 APPROVED Review Details
09/19/2024 RESIDENTIAL NEW DWELLING v.1 10/21/2024 REQUIRES RESUBMIT Review Details
07/09/2025 RESIDENTIAL NEW DWELLING REVISION v.2 08/06/2025 APPROVED Review Details
10/23/2024 RESIDENTIAL NEW DWELLING v.2 10/23/2024 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-RES-0924-05356
Permit Status: Issued
Permit Description: SFR
Total Outstanding Activity Conditions - 1
Date Name
10/31/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/

Conditions

Permit Number - TC-RES-0924-05356
Permit Status: Issued
Permit Description: SFR
Date Description Comments
11/27/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
10/31/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-RES-0924-05356
Permite Description: SFR
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
03/18/2025 COT - RSBU - Preslab N/A Partial Pass 3/18/25: reinforcement per plan at slab ok to proceed with concrete pour. Pending footings at porch columns.
04/04/2025 BULD - Electrical Clearance N/A Re-inspection required 4-4-25, see previous notes. Also,provide a moisture barrier behind the sub panel/panel #2.
12/09/2025 COT - RSEL - Electrical Final N/A Not Ready
12/09/2025 COT - RSPL - Plumbing Final N/A Not Ready
12/09/2025 RSBU - Building Final N/A Not Ready

Completed Inspections

Permit Status: Issued
Permit Number: TC-RES-0924-05356
Permit Description: SFR
Total Completed Inspections - 13
Date Description Inspector Results Comments
03/05/2025 COT - RSPL - Rough Soil Passed
04/02/2025 COT - RSBU - Preslab Passed Footings for cmu columns and toe downs approved per Detail #2 page S1.0. Okay for concrete placement. 4/2/2025
04/03/2025 COT - RSEL - Electrical Underground Passed Approved from main 400 amp service to Panel A 200 amp. Okay to backfill. Shading is required. 4/3/2025
04/10/2025 COT - RSBU - Masonry Pregrout Passed CMU Columns at main house.
04/10/2025 BULD - Electrical Clearance Passed 400 amp panel at casita to serve both new structures; OK to set meter for new service.
04/10/2025 COT - RSBU - Excavation/Rebar/Zoning Passed CMU Columns at main house. Ok to,top-out and grout progress areas.
04/18/2025 COT - RSBU - Roof Nailing Passed Ok to dry-in roof system
04/28/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
06/04/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
07/24/2025 COT - RSPL - Gas Pressure Test Passed
12/09/2025 COT - RSPL - Sewer Passed
12/09/2025 COT - RSPL - Yard Water Line Passed
12/09/2025 COT - RSME - Mechanical Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-MECH REV V1_V2.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
PDSD_OWNER_BUILDER_AFFIDAVIT_MAIN HOUSE_V1.PDF DOCUMENTS VIEW
CONS-PLAN SET V2_V2.PDF DOCUMENTS VIEW