Permit: TC-RES-0924-05356
Permit Details
Status:
Issued
Type:
Residential Building - One or Two Family
Address:
1019 E SILVER ST
Address NEW:
1019 E SILVER ST
Apply Date:
09/16/2024
Applicant:
alex enoch
Description:
SFR
Permit Reviews
Permit Number - TC-RES-0924-05356
Permit Status: Issued
Permit Description: SFR
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/28/2025 | RESIDENTIAL NEW DWELLING REVISION v.1 | 04/28/2025 | REQUIRES RESUBMIT |
| 10/23/2024 | RESIDENTIAL NEW DWELLING v.3 | 11/13/2024 | APPROVED |
| 09/19/2024 | RESIDENTIAL NEW DWELLING v.1 | 10/21/2024 | REQUIRES RESUBMIT |
| 07/09/2025 | RESIDENTIAL NEW DWELLING REVISION v.2 | 08/06/2025 | APPROVED |
| 10/23/2024 | RESIDENTIAL NEW DWELLING v.2 | 10/23/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-RES-0924-05356
Permit Status: Issued
Permit Description: SFR
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 10/31/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
Conditions
Permit Number - TC-RES-0924-05356
Permit Status: Issued
Permit Description: SFR
| Date | Description | Comments |
|---|---|---|
| 11/27/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 10/31/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-RES-0924-05356
Permite Description: SFR
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/18/2025 | COT - RSBU - Preslab | N/A | Partial Pass | 3/18/25: reinforcement per plan at slab ok to proceed with concrete pour. Pending footings at porch columns. |
| 04/04/2025 | BULD - Electrical Clearance | N/A | Re-inspection required | 4-4-25, see previous notes. Also,provide a moisture barrier behind the sub panel/panel #2. |
| 12/09/2025 | COT - RSEL - Electrical Final | N/A | Not Ready | |
| 12/09/2025 | COT - RSPL - Plumbing Final | N/A | Not Ready | |
| 12/09/2025 | RSBU - Building Final | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: TC-RES-0924-05356
Permit Description: SFR
Total Completed Inspections - 13
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/05/2025 | COT - RSPL - Rough Soil | Passed | ||
| 04/02/2025 | COT - RSBU - Preslab | Passed | Footings for cmu columns and toe downs approved per Detail #2 page S1.0. Okay for concrete placement. 4/2/2025 | |
| 04/03/2025 | COT - RSEL - Electrical Underground | Passed | Approved from main 400 amp service to Panel A 200 amp. Okay to backfill. Shading is required. 4/3/2025 | |
| 04/10/2025 | COT - RSBU - Masonry Pregrout | Passed | CMU Columns at main house. | |
| 04/10/2025 | BULD - Electrical Clearance | Passed | 400 amp panel at casita to serve both new structures; OK to set meter for new service. | |
| 04/10/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | CMU Columns at main house. Ok to,top-out and grout progress areas. | |
| 04/18/2025 | COT - RSBU - Roof Nailing | Passed | Ok to dry-in roof system | |
| 04/28/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 06/04/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 07/24/2025 | COT - RSPL - Gas Pressure Test | Passed | ||
| 12/09/2025 | COT - RSPL - Sewer | Passed | ||
| 12/09/2025 | COT - RSPL - Yard Water Line | Passed | ||
| 12/09/2025 | COT - RSME - Mechanical Final | Passed |