Permit: TC-RES-0924-05245
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2822 W TIPPECANOE TR
Address NEW:
2822 W TIPPECANOE TR
Apply Date:
09/10/2024
Applicant:
steven gandara
Description:
Bedroom Suite Addition
Permit Reviews
Permit Number - TC-RES-0924-05245
Permit Status: Complete
Permit Description: Bedroom Suite Addition
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/11/2024 | RESIDENTIAL NEW DWELLING v.1 | 10/11/2024 | APPROVED |
Conditions
Permit Number - TC-RES-0924-05245
Permit Status: Complete
Permit Description: Bedroom Suite Addition
| Date | Description | Comments |
|---|---|---|
| 10/11/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0924-05245
Permite Description: Bedroom Suite Addition
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/13/2024 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Partial Pass | 11/13/24 partial pass. Ok to proceed with footer and stem wall. |
| 02/03/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Partial Pass | 2.3.26 Partial pass for first row of exterior brick. Proceed and continue to take videos as discussed and call in when ready for inspection. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0924-05245
Permit Description: Bedroom Suite Addition
Total Completed Inspections - 11
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/24/2024 | COT - RSPL - Rough Soil | Passed | OK to cover progress areas. | |
| 12/24/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 01/27/2025 | COT - RSBU - Preslab | Passed | 1-27-25, preslab inspection approved. Okay to pour concrete. | |
| 07/18/2025 | COT - RSBU - Roof Nailing | Passed | 7.18.25 ok to proceed |
|
| 07/22/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 7.17.25 Fire blocking near bathroom Seal all penetrations DWV and shower need to be under test Leak at the shower Ground all metallic fixtures 7.22.25 Satisfactory corrections made, ok proceed |
|
| 07/24/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 07/24/2026 Verified exterior brick lifts per plan. |
|
| 07/24/2026 | COT - RSEL - Electrical Final | Passed | 07/24/2026 Added AFCI breaker to circuits in living room and secured electrical whip at AC on roof. |
|
| 07/24/2026 | COT - RSME - Mechanical Final | Passed | ||
| 07/24/2026 | RSBU - Building Final | Passed | ||
| 07/24/2026 | COT - RSPL - Plumbing Final | Passed | ||
| 07/24/2026 | COT - RSEL - Outdoor Lighting | Passed |