Permit: TC-RES-0924-05228
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
629 N OLSEN AV
Address NEW:
629 N OLSEN AV
Apply Date:
09/10/2024
Applicant:
TFS Solar
Description:
roof mount 5.2 kW DC addition to existing photovoltaic solar system (new total system size: 11.82kW), 12 additional AC modules, 27kWh Storage, 2 Tesla Powerwall-3 batteries w/ integrated PV inverter with 2 strings each, 60A breaker each; 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch
Permit Reviews
Permit Number - TC-RES-0924-05228
Permit Status: Complete
Permit Description: roof mount 5.2 kW DC addition to existing photovoltaic solar system (new total system size: 11.82kW), 12 additional AC modules, 27kWh Storage, 2 Tesla Powerwall-3 batteries w/ integrated PV inverter with 2 strings each, 60A breaker each; 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/10/2024 | RESIDENTIAL SOLAR v.1 | 10/10/2024 | APPROVED |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0924-05228
Permit Description: roof mount 5.2 kW DC addition to existing photovoltaic solar system (new total system size: 11.82kW), 12 additional AC modules, 27kWh Storage, 2 Tesla Powerwall-3 batteries w/ integrated PV inverter with 2 strings each, 60A breaker each; 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/25/2024 | RSBU - Building Final | Passed | ||
| 10/25/2024 | COT - RSOL - Electrical Final Solar Project | Passed | ||
| 10/25/2024 | COT - RSOL - Electrical Underground Solar Project | Passed | ||
| 10/25/2024 | BULD - Electrical Clearance | Passed | Approved solar and Powerwall inverters - DGC/BAT Clearance to TEP is required |