Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-RES-0924-05220
Permit Details
Apply Date:
09/09/2024
Applicant:
Ryan koningsor
Description:
Build in-ground lagoon style pool. Will include gas heater and electric O3 pump system.
Permit Reviews
Permit Number - TC-RES-0924-05220
Permit Status: Issued
Permit Description: Build in-ground lagoon style pool. Will include gas heater and electric O3 pump system.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
10/25/2024 | RESIDENTIAL POOL REVISION v.2 | 11/12/2024 | APPROVED |
09/12/2024 | RESIDENTIAL POOL v.1 | 09/27/2024 | APPROVED |
10/24/2024 | RESIDENTIAL POOL REVISION v.1 | 10/24/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-RES-0924-05220
Permit Status: Issued
Permit Description: Build in-ground lagoon style pool. Will include gas heater and electric O3 pump system.
Date | Description | Comments |
---|---|---|
09/27/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-RES-0924-05220
Permit Description: Build in-ground lagoon style pool. Will include gas heater and electric O3 pump system.
Total Completed Inspections - 5
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/01/2024 | Pool/Spa - Electric | Passed | ||
11/01/2024 | RSEL - Electrical Progress | Passed | ||
11/01/2024 | Pool/Spa - Bonding Grip | Passed | ||
11/07/2024 | Pool/Spa - Gas | Passed | ||
11/07/2024 | Pool/Spa - Pre-Gunite | Passed |