Permit: TC-RES-0924-05110
Permit Details
Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Address:
7283 S VIA TIERRA MESA
Apply Date:
09/05/2024
Applicant:
Hailey McGraw
Description:
ROOF MOUNTED PV SYSTEM 7.11kW DC / 5.0kW AC
Permit Reviews
Permit Number - TC-RES-0924-05110
Permit Status: Inspections complete
Permit Description: ROOF MOUNTED PV SYSTEM
7.11kW DC / 5.0kW AC
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/05/2024 | RESIDENTIAL SOLAR v.1 | 10/04/2024 | APPROVED |
Conditions
Permit Number - TC-RES-0924-05110
Permit Status: Inspections complete
Permit Description: ROOF MOUNTED PV SYSTEM
7.11kW DC / 5.0kW AC
Date | Description | Comments |
---|---|---|
10/08/2024 | The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account. | |
10/08/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-0924-05110
Permit Description: ROOF MOUNTED PV SYSTEM
7.11kW DC / 5.0kW AC
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/02/2024 | RSBU - Building Final | Passed | ||
12/02/2024 | COT - RSOL - Electrical Final Solar Project | Passed | ||
12/02/2024 | BULD - Electrical Clearance | Passed | Approved - DGC Clearance to TEPis required for the solar meter |