Permit: TC-RES-0923-08437
Permit Details
Apply Date:
09/29/2023
Applicant:
Andres Bautista-Aranda
Description:
Roof-mounted solar PV installation. (11.157) kW AC (12.180) kW DC (28) modules (28) micro-inverters MPU from 100A to 225A is required.
Permit Reviews
Permit Number - TC-RES-0923-08437
Permit Status: Inspections complete
Permit Description: Roof-mounted solar PV installation.
(11.157) kW AC
(12.180) kW DC
(28) modules
(28) micro-inverters
MPU from 100A to 225A is required.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
11/03/2023 | RESIDENTIAL SOLAR v.2 | 11/03/2023 | REQUIRES RESUBMIT |
11/03/2023 | RESIDENTIAL SOLAR v.3 | 11/03/2023 | REQUIRES RESUBMIT |
01/11/2024 | RESIDENTIAL SOLAR v.5 | 01/23/2024 | APPROVED |
10/02/2023 | RESIDENTIAL SOLAR v.1 | 10/23/2023 | REQUIRES RESUBMIT |
12/14/2023 | RESIDENTIAL SOLAR v.4 | 01/11/2024 | REQUIRES RESUBMIT |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-0923-08437
Permite Description: Roof-mounted solar PV installation.
(11.157) kW AC
(12.180) kW DC
(28) modules
(28) micro-inverters
MPU from 100A to 225A is required.
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/20/2024 | COT - RSOL - Grounding/Bonding Solar Project | N/A | Partial Pass | INCR CLEARANCE called into TEP at 1:40. Partial pass to leave open for future solar clearance. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-0923-08437
Permit Description: Roof-mounted solar PV installation.
(11.157) kW AC
(12.180) kW DC
(28) modules
(28) micro-inverters
MPU from 100A to 225A is required.
Total Completed Inspections - 4
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/20/2024 | BULD - Electrical Clearance | Passed | INCR CLEARANCE called into TEP at 1:40 | |
03/27/2024 | COT - RSOL - Grounding/Bonding Solar Project | Passed | ||
03/21/2024 | RSBU - Building Final | Passed | CLOSE PERMIT | |
03/21/2024 | COT - RSOL - Electrical Final Solar Project | Passed |