Permit: TC-RES-0923-08368
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
4850 S MOUNTAIN AV
Address NEW:
4850 S MOUNTAIN AV
Apply Date:
09/27/2023
Applicant:
Bailey Randall
Description:
Add on Roof Mounted PV System DC SYSTEM SIZE (kW): 4 kW / AC SYSTEM SIZE (kW): 2.9 kW with main service panel upgrade to 200 A 10 modules
Permit Reviews
Permit Number - TC-RES-0923-08368
Permit Status: Complete
Permit Description: Add on Roof Mounted PV System DC SYSTEM SIZE (kW): 4 kW / AC SYSTEM SIZE (kW): 2.9 kW with main service panel upgrade to 200 A
10 modules
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/13/2024 | RESIDENTIAL SOLAR v.2 | 03/20/2024 | APPROVED |
| 09/27/2023 | RESIDENTIAL SOLAR v.1 | 10/09/2023 | APPROVED |
| 11/22/2023 | RESIDENTIAL SOLAR v.1 | 12/07/2023 | APPROVED |
| 03/11/2024 | RESIDENTIAL SOLAR v.1 | 03/12/2024 | REQUIRES RESUBMIT |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0923-08368
Permite Description: Add on Roof Mounted PV System DC SYSTEM SIZE (kW): 4 kW / AC SYSTEM SIZE (kW): 2.9 kW with main service panel upgrade to 200 A
10 modules
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/09/2024 | BULD - Electrical Clearance | N/A | Partial Pass | Partial for the 60A meter adapter, DGL Clearance was called into TEP at 11:35am Pending solar |
| 05/16/2024 | COT - RSOL - Grounding/Bonding Solar Project | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0923-08368
Permit Description: Add on Roof Mounted PV System DC SYSTEM SIZE (kW): 4 kW / AC SYSTEM SIZE (kW): 2.9 kW with main service panel upgrade to 200 A
10 modules
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/16/2024 | BULD - Electrical Clearance | Passed | Approved, DGC Clearance to TEP is required for the solar meter | |
| 05/16/2024 | COT - RSOL - Electrical Final Solar Project | Passed | ||
| 05/16/2024 | RSBU - Building Final | Passed |